Long Island East Side Tunnel


Summary

East Side Access is a public works project being undertaken by the Metropolitan Transportation Authority (MTA) in New York City. This project is designed to bring the Long Island Rail Road (LIRR) into a new East Side station to be built below, and incorporated into, Grand Central Terminal. The project will route the LIRR from its Main Line through new track connections in Sunnyside Yard and through the lower level of the existing 63rd Street Tunnel under the East River. In Manhattan, a new tunnel will begin at the western end of the 63rd Street Tunnel at Second Avenue, curving south under Park Avenue and entering a new LIRR terminal beneath Grand Central.

To date, the estimated total cost has increased, and the estimated completion date has been pushed back multiple times.

O’C&L was retained by the general contractor to assist in the revision and maintenance of the project critical path method (CPM) schedule. In addition, O’C&L has provided support in preparing and pursuing change orders as they develop on the project.



Share this post